Clovis Custom Cabinets builds cabinet installation to order in Clovis, California, and installs across the greater Fresno area.

Wall-to-wall cabinetry combining closed base storage with open display shelving
Cabinet Installation built to order in Clovis, California.

What cabinet installation actually involves

Installation is the shortest phase of a cabinet project and the one that decides whether the finished room looks built or looks assembled. Cabinet installation in Clovis runs into the same two conditions in most houses: floors that are not flat and walls that are not square. Neither is a defect. Houses settle, slabs cure unevenly, and framing has tolerances. The job of an installer is to absorb all of that so the finished run reads straight.

We install cabinetry two ways. Installation is included in every project we build, because the fit is part of what you are buying. We also install cabinetry you bought somewhere else, which is a different job with its own set of things to check first.

Where installation goes wrong

  • Set to the floor instead of to a level line. Floors are never flat. A run set to the floor follows the dip, and the countertop, which is rigid, will not follow it
  • Fastened into drywall. Wall cabinets carry real weight once loaded. They belong in framing
  • Gaps closed with caulk instead of scribe. A scribed filler follows the wall. A bead of caulk in a tapering gap is visible from the first day and worse by the second year
  • Doors hung but never adjusted. A six way hinge has three adjustments. Skipping the final pass is the single most common reason a new kitchen has uneven reveals
  • Countertops templated too early. A slab is flat and rigid. Templating from drawings or from the old counter produces a top that does not match the cabinets underneath

Installing cabinets you bought elsewhere

If you have already bought your cabinetry, from a retailer, an online supplier, a designer, or a builder's allowance, we will install it. This is a common situation and it comes with one recurring problem worth knowing about before install day.

Orders arrive incomplete far more often than people expect. The cabinets themselves are usually all there. What goes missing is everything around them: filler strips, finished end panels, toe kick, light rail, crown, scribe moulding, and sometimes the hinges and glides. Those are the parts that make a run of boxes read as a fitted kitchen, and they are the parts most frequently left off an order taken over a counter or through a website.

So before we quote a supplied cabinet installation, we check:

  • Whether the order is complete. Every filler, panel, and trim piece against the plan and the actual walls, which is where most gaps show up
  • Whether the boxes are assembled. Flat packed and ready to assemble cabinetry has to be built before it can be hung, and that is real labour that belongs in the quote rather than appearing as a surprise
  • Whether the sizes suit the room. Stock and semi custom cabinetry comes in three inch increments, so leftover space gets closed with fillers. We will tell you where those land before we start, not after
  • Condition on arrival. Shipping damage is worth finding before demolition day rather than on it, because a replacement door can take weeks
  • Hardware and accessories. Hinges, glides, and any interior fittings, which are sometimes packed separately and sometimes not ordered at all

None of this is a reason to avoid buying your own cabinetry. It is a reason to have someone look at the order against the room before the old kitchen comes out. We will do that at the free measure and tell you plainly what is missing.

Our installation process

  1. Protection and removal

    Plastic at doorways, runners on the floor along the route in, and the old cabinetry and countertop out. This is the noisiest and dustiest day. It is also when surprises appear behind the sink base, so anything we find is reported the same day with a price attached rather than added to a final invoice.

  2. Layout and level line

    We find the high point of the floor and strike a level line around the room. Every base cabinet is set to that line, not to the floor. Getting this right is the whole job, because everything above depends on it.

  3. Base cabinets

    Shimmed to level, scribed to the wall, fastened into studs, and joined to each other so the run behaves as one assembly rather than a row of boxes.

  4. Wall and tall cabinets

    Hung from a ledger line and anchored into framing. Tall pantry and oven cabinets are set and secured, and any run going to the ceiling is scribed to it.

  5. Fillers, trim, and hardware

    Scribed fillers where walls are out of square, toe kick, light rail, crown, and end panels. Then knobs, pulls, hinges, and glides.

  6. Adjustment and walkthrough

    Every door and drawer adjusted for consistent reveals and even closing. We walk the room with you and list anything outstanding in writing.

Coordination that has to happen in the right order

ItemWhen it happensWhy the order matters
CountertopsTemplated after bases are set and levelledThe template is taken off the actual cabinets. Fabrication then runs one to two weeks, so there is a window with cabinets and no counter
Sink and plumbingReconnected the day the counter goes inWorth asking your installer to coordinate so you are not without a sink for an extra day
AppliancesOpenings built to the manufacturer's spec sheetPublished dimensions vary between models. We work from your actual model numbers, not from nominal sizes
FlooringDecided before cabinets are setWhether flooring runs under the cabinets or stops at the toe kick changes the finished height and what happens when the floor is next replaced
Electrical and gasAny relocation before installMoving a circuit or a gas line is work for the appropriate licensed trade, and it is far cheaper before the boxes are in

What affects the installation timeline

A typical kitchen installation runs about four working days: demolition, base cabinets, wall and tall cabinets, then trim and adjustment. Countertop fabrication adds one to two weeks after templating. A single bathroom vanity is usually a one day install. What extends it:

  • Walls significantly out of square, which means more scribing
  • A soffit removal, which adds demolition, drywall repair, and a texture match
  • Damage discovered behind the old cabinets, most often at the sink base
  • Relocated plumbing, gas, or electrical
  • Ceiling height runs and crown, which take longer to fit than a standard height run
Custom kitchen cabinets with white shaker doors, a quartz waterfall island, and a wood range hood
Related work: shaker kitchen with waterfall island.
Why us

Why choose Clovis Custom Cabinets for cabinet installation

Set to a level line, not to your floor

We find the high point of the floor and work to a struck level line around the room. Base cabinets are shimmed to that line and scribed to the wall. It is slower than setting to the floor and it is the reason a countertop sits flat and doors hang even.

Anchored into framing

Wall cabinets are hung from a ledger line and fastened into studs rather than into drywall with anchors. Loaded wall cabinets carry real weight, and this is not a place to save twenty minutes.

Adjusted before we call it finished

Concealed hinges adjust in three directions and drawer fronts adjust independently of their boxes. The final pass setting consistent reveals across every door and drawer is part of the install, not a callback.

Proof

What every project gets

6

Faces sealed on every door

Every door and drawer front is finished on all six faces including the top and bottom edges nobody sees. Bathroom and laundry cabinets fail from those hidden edges upward, and sealing them is what keeps a panel from swelling and pushing a door out of alignment.

100 lb

Drawer glide rating

Full extension undermount glides rated to 100 pounds on every drawer, with dovetailed solid maple boxes. Not an upgrade line, not reserved for the deep drawers. It is what lets a base drawer hold cast iron rather than plastic containers.

0

Deposits taken without a written lead time

You get your lead time in writing before you pay anything, and you are told your install week before the build starts rather than after it slips. If a date moves, you hear it from us first.

Service area

Where we offer cabinet installation

Based in Clovis, California and working across the greater Fresno area, including Fresno, Madera, Sanger, Selma, Reedley, and Kerman. See the full service area.

Answers

Cabinet Installation FAQs

How long does cabinet installation take?

A typical Clovis kitchen runs about four working days on site: demolition on day one, base cabinets on day two, wall and tall cabinets on day three, and trim, hardware, and adjustment on day four.

Countertops are templated after the bases are set and levelled, and fabrication then runs one to two weeks before a separate one day installation. A single bathroom vanity is usually a one day job. You get a written schedule before work starts.

Do I need to empty my kitchen before you arrive?

Yes, completely, including the cabinet above the refrigerator. Do it a few days ahead rather than the night before. Kitchens hold considerably more than people estimate, and a half emptied kitchen on the morning of day one costs everyone half a day.

It is also worth setting up a temporary kitchen elsewhere with the refrigerator, a microwave, a kettle, and a folding table. Plan for the full duration including the countertop window, not the optimistic version.

Will my walls and floors need work first?

Usually not. Walls that are out of square and floors that are out of level are normal and are what scribing, shimming, and fillers exist to absorb. We measure for this at the field measure so it is designed in rather than discovered on install day.

Genuine repairs are a different matter. Water damage behind a sink base, a failed subfloor, or drywall that will not hold anything gets reported with a price before we work around it.

Can you install cabinets while I keep using the kitchen?

Not really. From demolition until the countertop is installed the room is out of service, and that window is the four day install plus the one to two week countertop fabrication.

You can shorten the disruption by having every decision made and every material on hand before demolition starts. Most delays are waiting on a selection, not waiting on the crew.

Can you install cabinets I bought from a retailer or online?

Yes. We install cabinetry supplied by the customer as well as cabinetry we build, including flat packed cabinets that have to be assembled first. Assembly is real labour, so it is quoted rather than assumed.

The one thing worth doing before you order is having someone check the plan against the actual walls. The most common problem with a supplied order is not the cabinets, it is the missing fillers, end panels, and trim, and those are much easier to add before delivery than after demolition has started.

What happens if something does not fit?

You hear about it the same day, with a price if it changes the cost, before any work continues. That is the whole standard. The failure mode to watch for in this trade is a crew that quietly works around a problem and you discover it at the final invoice or two years later.

Because we build to your measured openings after demolition rather than to a catalogue of stock sizes, fit problems are far less common than they are on a stock or semi custom order.

Get your cabinet installation quote

Free in-home consultation and measure. Written quote, written lead time, no obligation.

Call now Get quote
Call (559) 314-3498