Wall-to-wall cabinetry combining closed base storage with open display shelving
Wall-to-wall built-ins

Installation is the shortest phase of a cabinet project and the one homeowners worry about most. Here is what actually happens, day by day.

Before the crew arrives

Two things are yours to do, and both matter more than they sound:

  • Empty every cabinet completely, including the awkward one above the fridge. Not the day before, a few days before. Kitchens hold considerably more than people estimate, and a half emptied kitchen on day one costs everyone the morning
  • Set up a temporary kitchen elsewhere. Refrigerator, microwave, kettle, and a folding table in the dining room or garage. Plan for the full duration, not the optimistic version

Worth confirming with your installer beforehand: where the crew will park, where debris will be staged, which bathroom they should use, whether you have pets that need containing, and what time they start.

Day 1: demolition

The old cabinets come out, along with the old countertop. This is the noisiest and dustiest day by a wide margin. Expect plastic sheeting over doorways, runners on the floor along the route in, and the kitchen becoming genuinely unusable.

This is also when surprises appear: water damage behind the sink base, walls further out of square than they looked, or wiring that is not where anyone expected. A good crew flags these immediately rather than working around them silently. If something is found, you should hear about it the same day with a price attached, not discover it on the final invoice.

Day 2: layout and base cabinets

Before anything is fastened, the installer finds the high point of the floor and establishes a level line around the room. Every base cabinet is set to that line rather than to the floor, because floors are never flat, particularly in older Clovis homes that have settled.

Base cabinets go in first, are shimmed to level, scribed to the wall, fastened into studs, and joined to each other. Getting this right is the entire job. Everything above depends on the bases being dead level, and a countertop is rigid and will not forgive it.

Day 3: uppers and tall units

Wall cabinets are hung from a ledger line, anchored into framing rather than drywall alone. Tall pantry and oven cabinets are set and secured. If a soffit was removed, this is where you finally see the height you gained.

By the end of this day the kitchen looks finished to an untrained eye. It is not: doors and drawers are typically hung but not yet adjusted, and there is trim work outstanding.

Day 4: trim, doors, adjustment

Toe kicks, scribe moulding, light rail, crown, and filler panels go on. Every door and drawer is then adjusted, which on a full kitchen is genuinely a few hours of work. Concealed hinges adjust in six directions and each door gets set individually so reveals are consistent across the run.

This is the step that separates a good install from an adequate one, and it is the step most often rushed. Consistent reveals are what your eye reads as quality, even if you never consciously notice them.

The gap: countertop template and fabrication

Countertops are templated after the bases are set and levelled, never before. A digital template is taken, then fabrication runs one to two weeks, then installation is usually a single day.

So there is a window where you have cabinets and no countertop and no kitchen sink. This is normal on any project using stone or quartz and cannot be compressed. Ask your installer to coordinate the plumbing reconnection so the sink is back the same day the counter goes in.

Why templating early goes wrong. A slab is rigid and perfectly flat. Cabinets in older homes frequently are not, and walls are rarely square. Templating from drawings or from the old countertop produces a slab that rocks, an uneven reveal at the backsplash, or a seam that opens within a year. Any fabricator who wants to template before the bases are in is telling you something about how they work.

The walkthrough and punch list

Walk the kitchen with the installer, not alone afterwards. Open and close every door and every drawer. Look along each run at eye level to check reveals are even. Check that nothing binds, that soft close engages on every door, and that the toe kick is continuous.

Write the punch list down and get a date against each item. A verbal list of three small items becomes a forgotten list of three small items. A written one with dates gets finished.

Reasonable punch items: a door needing further adjustment, a small finish touch up, a missing shelf pin, trim needing caulk. Not reasonable: a cabinet built to the wrong dimension, or a finish that does not match the approved sample.

The first few weeks

Two things worth knowing. Finishes keep hardening for weeks after they are dry to the touch. Avoid harsh cleaners and scrubbing during the first two to three weeks; cabinets scrubbed hard in week one show it permanently.

And doors may need one more adjustment after a few weeks as the house and the cabinetry settle to each other. That is normal, not a defect. A shop worth using will come back and reset them.

Our custom kitchen cabinets page covers the full process from consultation to walkthrough, and how long custom cabinets take covers the weeks before installation week.

What can go wrong, and what a good response looks like

On a demolition in an older house, occasionally something is found. What matters is not whether it happens but how it is handled.

Water damage behind the sink base. Common, and often invisible until the cabinet comes out. A good response is to stop, show you, explain the repair, and price it before continuing. A bad response is to build over it.

Walls further out of square than expected. Handled with scribing, which is normal work. It becomes a problem only if the cabinets were built to a drawing dimension rather than a field measurement.

Ducting inside a soffit. Should have been found during design. If it appears during demolition, expect a schedule impact and a change order.

Appliance does not fit the opening. This traces back to whether cabinet openings were built to your specific model's specification sheet. Ask at the design stage which model numbers were used.

The pattern in every case is the same: you should hear about it the same day, with a price, before work continues. Discovering any of it on the final invoice is the failure.

Protecting the rest of the house

Demolition day generates dust that will travel if it is not contained. A crew worth having will:

  • Seal doorways to adjacent rooms with plastic sheeting
  • Run floor protection along the whole route from the entry to the kitchen, not just in the kitchen
  • Cover or remove nearby furniture
  • Close and cover HVAC returns in the work area, so dust is not distributed through the ducting
  • Clean up at the end of each day rather than only at the end of the job

This matters more in the drier parts of the valley, where fine dust stays airborne longer, and it matters a great deal if anyone in the household has respiratory sensitivity. It is a reasonable thing to ask about before work starts rather than after.

If your home was built before 1978, work disturbing painted surfaces is also governed by the federal Renovation, Repair and Painting rule, which sets specific containment requirements. Establish the age of the house with your contractor early.

Clovis Custom Cabinets builds custom cabinetry to order in Clovis, California, for homes and businesses across the greater Fresno area. For a free measure and a written quote, call (559) 314-3498.

Financing available on cabinetry projects

Most kitchen cabinetry projects land between $8,000 and $40,000. We work with homeowners who would rather spread that over monthly payments than pay in full up front. Ask your estimator to walk you through the options during your free consultation.

See financing options
Answers

Frequently asked

How long does cabinet installation take?

Three to five days on site for a standard kitchen: demolition on day one, base cabinets day two, uppers and tall units day three, then trim and door adjustment. Countertops follow separately, templated after the bases are level and installed one to two weeks later.

What should I do before cabinet installers arrive?

Empty every cabinet completely, including the awkward one above the refrigerator, and do it a few days early rather than the night before. Set up a temporary kitchen with the refrigerator, microwave, and kettle somewhere else in the house. Confirm parking, debris staging, pet containment, and start times with the installer beforehand.

Why can't countertops be measured before cabinets are installed?

Because a slab is rigid and perfectly flat while cabinets and walls rarely are. Templating from drawings or from the old countertop produces a slab that rocks, an uneven reveal at the backsplash, or a seam that opens within a year. The template has to be taken from the installed and levelled bases.